1. Safety Instructions
4
Audience
4
Ce Marking
4
User Precautions
4
Environment
5
Inquiries
5
2. Mechanical Installation
6
Delivery Check
6
Unpacking And Visual Inspection
6
3. Planning Before Installation
8
4. Cabinet Installation
9
Maiantenance Bypass Switch
9
Transformer Option
11
External Battery Cabinet Option
12
Battery Racks
12
5. Electrical Installation
13
Power Cables And Protective Fuses
14
Wiring Procedure
15
External Battery Cabinet (Ebc) Installation Procedure
21
6. Software And Connectivity
24
Communication Cables
24
Connection To The Standard Rs-232 Port (X53)
24
Lansafe Software
25
External Control Connections
25
Emergency Power Off (Epo)
26
Relay Outputs
26
Programmable Signal Inputs
27
Xslot Communication (Option)
28
Web/Snmp Module (Optional)
28
As400 Relay Module (Optional)
29
Single Serial Port Module (Optional)
29
Modus/Jbus Module (Optional)
29
7. User Operations
30
Display Functions
30
User Settings
31
Configuring User Settings
33
Changing Language
33
Changing Charging Current
33
Using Relay Outputs
33
Normal Start-Up
34
Battery Start-Up
34
Start-Up After Epo
34
Shutdown
35
8. Maintenance
36
Regular Service/Intervals
36
Batteries
36
Cooling Fan
37
Led Indicators
37
Maintenance Bypass Switch (Mbs) Operation
37
Turn Ups From Normal Mode To Mechanical Bypass
38
Turn Ups From Mechanical Bypass To Normal Mode
39
9. Parallel Systems
41
Overview
41
Tie Cabinets
42
Xslot Hot Sync Card: Installing And Wiring
46
Parallel Operations
47
10 Recycling The Used Ups Or Batteries
49
11. Dimensional Drawings
50
12. Technical Data
52
Standards
52
Environment
52
Mechanical Configuration
52
Characteristics
52
Ac Input
53
Dc Circuit
53
Ac Output
53
13. Warranty
54
Diskussion
Lämna en kommentar eller ställ en fråga
Delta i diskussionen
Ställ en fråga om bruksanvisningen eller lägg till ett användbart svar för andra användare.